80%
Block Loading
Takes Your Load in One Step
When the power cuts and the lift, the compressor and the AC bank all restart together, most gensets bog down. The RT+ range accepts 70–80% of rated load in a single step — and we publish that figure for every rating. Ask any competitor for theirs in writing.








